TèKHNE Energy Management

TèKHNE / PROJECTS / AIR CONDITIONING

A microsurgery room.
Space and systems, one integrated project.

From the rough structure to the completed room: the design and construction of the environment and the related air conditioning system.

Microsurgery roomAir conditioningAir treatment and exchange
The project ↓The project data ↓The photographs ↓
The completed microsurgery room

AIR CONDITIONING / THE PROJECT

From the construction site
to the finished environment.

The photographs document the room, the ducts and the air handling unit.

Watch the making ↓

01 / THE PROJECT

Design the space.
Integrate the systems.

The case starts from a rough structure and arrives at the construction of the microsurgery room and its air conditioning system. The photographic story relates the finished environment to the components that serve it.

Ducting and air treatment units make the plant work visible, as well as that on the spaces. The gallery allows you to observe both the installations and the completion of the room.

Destination of the environment
Microsurgery room
Starting condition
Raw structure
Scope of the intervention
Hall and air conditioning system
Documented components
Ducting and AHU

02 / THE PROJECT DATA

Air renewal in the system design.

The values reported in the original description of the intervention.

SPARE PARTS EXPECTED9 volumes/hour

Design value for room air exchange.

EXTENSION EXPECTED15 volumes/hour

Possibility of extension indicated in the original case.

Data referring to the project described. The sizing of each new environment is defined in relation to the intended use and specific requirements.

FROM PROJECT TO SERVICE

Design the air conditioning.
Starting from the environment.

Discover the service ↗

YOUR NEXT INTERVENTION

Let's start from the context.
Let's define the project.

Let's discuss the needs, spaces and priorities of your organization.

Let's talk about the project ↗